 Kayenergi Indonesia |
| Depan |
 |
| Info Perusahaan |
 |
| Penawaran Dagang |
| |
- Penawaran Jual(2)
|
 |
| Bagi pengalaman anda |
| |
- Menulis tinjauan
- Kenalkan ke teman Anda
|  |
| Hubungi Kami |
 |
| | |
|
| Info Perusahaan |
| |
| Rata-rata Tinjauan Pemakai |
Tidak ada ulasan untuk perusahaan ini - Menulis tinjauan | | |
| Tanggal Bergabung: |
27 Oct. 2007 |
Terakhir Diperbarui: |
25 Mar. 2008 |
|
| Korespondensi Perusahaan |
| Nama: |
Tn. Eko Nilo [Pemasaran] |
| E-mail: |
Kirim Pesan |
| Nomer HP: |
+6285281994438 |
| Nomer Telpon: |
+6285281994438 |
| Nomer Faks: |
+6251261409 |
| Alamat: |
Jalan Jamrud no.07 - Sungai Danau - Satui Tanah Bumbu, Kalimantan Selatan Indonesia |
|
| Sifat Dasar Usaha: |
Pabrikan, Dagang, Jasa dari kategori Enerji
|
|
| Penjelasan Ringkas |
STEAM COAL 5500 Kcal/ Kg Reject 5300 Kcal/ Kg (Crushed) - Rp 220, 000, -
STEAM COAL 5500 Kcal/ Kg Reject 5300 Kcal/ Kg (ROM) - Rp 205, 000, -
STEAM COAL 5800 Kcal/ Kg Reject 5600 Kcal/ Kg (Crushed) - Rp 300, 000, -
STEAM COAL 5800 Kcal/ Kg Reject 5600 Kcal/ Kg (ROM) - Rp 285, 000, -
Coal Spesification
GCV : 5.717 Kcal/ Kg (adb)
Total Moisture : 26, 01 % (ar)
Inherent Moisture : 16 % (adb)
Ash : 3.5 % (adb)
Volatile Matter : 39 % (adb)
Fixed Carbon : 40 % (adb)
Total Sulphur : 0.98 % (adb)
HGI : 45
Mining Site
Location : The Mining area is located in Desa Jombang, Regency of Tanah Bumbu in South
Kalimantan Province. The Mining Concession name is KP Erlianti Permata Top
Indonesia (by H.Jahrian). with the original concession area 199 hectare (extension
area until 394, 30 hectare).
Mining Permitt : Exploration
Name : KP Erlianti Permata Top Indonesia
No. : 540 / 77 / KP / D.PE
Date : November 20, 2007
Code : TB.04 DESPR 155
Area : 394, 30 hectare
Explotation :
Name : KP Erlianti Permata Top Indonesia
No. : 545 / 177-EX / KP / D.PE
Date : November 20, 2007
Code : TB.04 DESPR 155
Area : 199, 10 hectare
Hauling Road
Distance : 18 km to barge loading (port KGS 2)
Wide : 12 meter
Construction : Agragate
Coal Hauling
System : Trucking
Capacity : 10 – 20 tons
Travel Speed Empty : 50 km/ hour
Travel Speed Loaded : 30 km/ hour
Loading Time : 0.19 hours
Unloading Time : 0.11 hours
Working Hour Effective : 16 hours per day (2shift)
Coal Prosessing
ROM Stockpile Capacity : 60, 000 mt
Crushing Capacity : 500 mt per hour
Crush Coal Stockpile Cap : 50, 000 mt
Coal Transhipment / Barge Loading Port
Port of Loading : Satui, Regency of Tanah Bumbu, South Kalimantan, Indonesia
Name of Port : BAC ( Bahari Alam Ceria ) - APTS
Loading System : Ramp Door Trucking Lossing + Conveyor
Loading Rate : 6, 000 - 8, 000 MT per day
Barges Capacity : 300 feet (8000mt)
System : Tug Barge
Distance : 10 miles to Muara Satui Anchorage (open sea)
Min Order Per Barge : 5, 500 MT
Min Order Per Shipment : 30, 000 MT
Max Supply : to be confirmed for each serious enquiries.
Delivery Schedule : At Buyer Option but to be Confirmed by Seller
Site Visit : Can be arranged at buyer cost for contract signing and mine site visit
Inspection : Equivalent at Seller’s cost during loading port
Origin : Indonesia
Packaging : Bulk
Payment System
Term : please contact us for more detail information
Incoterms Term : F.O.B - Barge (NO CIF or CNF)
|
| | Ingin menghubungi perusahaan ini?
Permintaan Anda akan disimpan di "Surat Bisnis".
|
|
|